Division G - General

These parts specify the preliminaries and requirements for management systems (including quality, safety & environmental).

Document NameComments / Instruction

Division G - General


Part G20C Quality (Customised) (.docx)

This Part may be edited to suit non-standard contracts

Part G25 Risk management (.pdf)

Required in Design & Construct Contracts

Part G30 Work Health & Safety (.docx)

Used where the Contractor has a WHS Management System based on AS4801

Part G30 Work Health & Safety (.pdf)

Used where the Contractor has a WHS Management System based on AS4801

Part G30 Work Health & Safety MP (.docx)

This Part is normally used for contracts valued between $450,000 and $1.1 million

Part G30MP Work Health & Safety - Management Plan (.pdf)

This Part is normally used for contracts valued between $450,000 and $1.1 million

Part G30 Work Health & Safety SWMS (.docx)

Only use this Part for construction contracts valued less than $450,000