Division R Roadworks - Pre 1 July 2018
These parts specify requirements for roadworks and general construction, including drainage, earthworks, pavements, lighting, guardrail, Intelligent Transport Systems (ITS) and sundry works.
Document Name | Comments / Instruction |
Part R34 Surface Characteristics - Spray Seals (.pdf) | Used where the Contractor is responsible for design of the spray seal. Will require extended Defects Liability Period |
Part R36 Shoulder Construction (.pdf) | Use for minor upgrade of shoulders; ie. “top up” and bituminous surfacing. Do not use for full depth shoulder construction using new materials. |