Skip to main content
Menu

Temporary Lane Closures on South Road

26 June 2015

Motorists are advised that South Road and Richmond Road will be reduced down to one lane in each direction at the intersection of the two roads between 8.00pm on Friday 3 July and 7.00am on Monday 6 July.

The closures are necessary for profiling and asphalt works as part of the South Road / Richmond Road intersection upgrade.
Variable message signs will be in operation to advise motorists of travel times.

Preparatory works will also take place between 8.00pm on Saturday 27 June and 11.00am on Sunday 28 June at this location that will require temporary lane and speed restrictions.

The Department of Planning, Transport and Infrastructure (DPTI) thanks road users for their patience.The closures are necessary for profiling and asphalt works as part of the South Road / Richmond Road intersection upgrade.

Variable message signs will be in operation to advise motorists of travel times.

Preparatory works will also take place between 8.00pm on Saturday 27 June and 11.00am on Sunday 28 June at this location that will require temporary lane and speed restrictions.

The Department of Planning, Transport and Infrastructure (DPTI) thanks road users for their patience.The closures are necessary for profiling and asphalt works as part of the South Road / Richmond Road intersection upgrade.

Variable message signs will be in operation to advise motorists of travel times.

Preparatory works will also take place between 8.00pm on Saturday 27 June and 11.00am on Sunday 28 June at this location that will require temporary lane and speed restrictions.

The Department of Planning, Transport and Infrastructure (DPTI) thanks road users for their patience.