Skip to main content
Menu

Mannum (Downstream) Ferry temporary interruption

11 May 2015

The Department of Planning, Transport and Infrastructure (DPTI) advises there will be a temporary interruption to the Mannum (Downstream) Ferry service on Tuesday, 12 May 2015.

The ferry service will not be operating between 9.00 am and 3.00 pm. The disruption is due to concrete ramp repair works.

The ferry will remain accessible to emergency vehicles in emergency only.

The Mannum (Upstream) Ferry will remain operational however vehicles greater than 10 tonnes will be required to detour to Murray Bridge (Downstream) or Purnong Ferry (Upstream).

DPTI thanks ferry users for their patience.