Darlington Upgrade Project
Latest News
The Darlington Upgrade Project commenced in May 2016 and was completed in January 2021.
Familiarise yourself with the Darlington roads and ramps – from the comfort of your screen
A suite of Darlington user experience animations have been developed to help you navigate through the new roads and ramps.
Select your start or end road to see a list of user experience videos that apply to your travel. Watch the video by clicking on the video title.
or
- Sturt Road to Main South Road (southbound)
- Sturt Road to Ayliffes Road (eastbound)
- Sturt Road to Tonsley Boulevard (northbound)
- Sturt Road to Flinders Drive, via Main South Road (southbound)
- Sturt Road to Sturt Road (westbound)
- Sturt Road to Southern Expressway (westbound)
- Sturt Road to Main South Road (southbound)
- Sturt Road to Ayliffes Road (eastbound)
- Southern Expressway to South Road (northbound)
- Southern Expressway to Ayliffes Road (northbound)
- Southern Expressway to Flinders Drive (northbound)
- South Road to Southern Expressway (southbound)
- South Road to Main South Road (southbound)
- South Road to Flinders Drive (southbound)
- Main South Road to South Road (northbound)
- Main South Road to Flinders Drive (northbound)
- Main South Road to Ayliffes Road (northbound)
- Flinders Drive to Southern Expressway (southbound)
- Flinders Drive to Main South Road (southbound)
- Flinders Drive to Flinders Drive (westbound)
- Flinders Drive to Main South Road (northbound)
- Ayliffes Road to Southern Expressway (southbound)
- Ayliffes Road to Main South Road (southbound)
- Ayliffes Road to Flinders Drive (southbound)
- Ayliffes Road u-turn (eastbound)
- Ayliffes Road to South Road (northbound)
- South Road to Main South Road (southbound) (pedestrian)
- Main South Road to South Road (northbound) (pedestrian)
- South Road to Shepherds Hill Road (southbound)
- Shepherds Hill Road to South Road (northbound)
- Sturt Road to Flinders Drive (southbound)
- Flinders Drive to Sturt Road (westbound)
Select your start or end road from the drop downs to watch the video that relates to your travel here.
You can also watch all videos via our YouTube Playlist.
The Darlington Upgrade Project is another important stage in the delivery of Adelaide's North-South Corridor and will deliver an upgrade of approximately 3.3 kilometres of the existing Main South Road, including:
- A non-stop motorway between the Southern Expressway and north of Tonsley Boulevard
- A non-stop motorway passing underneath Flinders Drive, Sturt Road, Sutton Road/Mimosa Terrace, Ayliffes Road bridge and Tonsley Boulevard
- Grade separation of the Main South Road/Ayliffes Road/Shepherds Hill Road intersection
- Main South Road (at grade) surface roads along both sides of the lowered motorway to provide connections to Flinders Drive, Sturt Road, Tonsley Boulevard and most local roads
- Full free flow interchange at the Southern Expressway/Main South Road with dedicated ramps providing direct access to, and from, the new motorway and Main South Road
- A two-lane overpass for northbound traffic travelling east on to Ayliffes Road
The $754.5 million project was jointly funded by Australian and State governments ($603.6 million federally funded and $150.9 million state funded). The project was open to traffic in 2020
Flinders Link
The Flinders Link Project is a joint initiative of the Australian and South Australian Governments to extend the Tonsley rail line to create new connections to our health, innovation and education precincts.